Paul Jennings of Aldas was on site on Friday to carry out the first air permeability test of the Mayville Community centre. Although a little later than expected, the building recorded a result of 0.53 air changes per hour at 50 Pascals (using the rigorous Attma standard 2007 methodology) – the first non-domestic retrofit result that we know of to reach the passivhaus requirement.

Mayville Community Centre Passivhaus Windows Fitting

The window fitting flash event was attended by 20 very keen architects and students last Thursday at the Mayville Community Centre all eager to learn from this practical training opportunity. The group witnessed the installation of one of the south elevation windows being installed in two pieces by the main contractor.

Thermal imaging of Passfield Drive
One of the trickiest aspects of sustainable housing is the existing building stock, but a scheme to involve small business in retrofitting and boost skills has thrown up some interesting techniques. Now the Green Deal needs to deploy this knowledge.
Article by Eleanor young
Riba Journal April 2011
Lime House Passivhaus

The two-bedroom, ultra low-cost Lime House in Ebbw Vale has just been awarded full Passivhaus certification. It also achieves code 5 of the Code for Sustainable Homes.

Larch House featured in Natural Building Technologies Newspaper.

Larch and Lime House receive Exemplar Award

At the launch of Constructing Excellence Wales’ Exemplar Programme, bere:architects received a pilot Exemplar Programme award for designing the Larch and Lime House at Ebbw Vale.

The awesome 4×2m triple glazed fixed roof lights have now been craned into place onto the main roof at Mayville completing the final phase of works to make the roof fully water tight. PV and Solar panel installations are now fully underway. The roof lights, both Velux and fixed units, will allow abundant natural daylight into the main hall whilst allowing for summer night time ventilation to purge any heat that has built up during the day. Internal plaster works and decorations are also well under way. All works are leading up to the first air test scheduled for the end of March.

Justin Bere of bere:architects is offering an opportunity to learn about German techniques for fitting triple glazed passivhaus windows including positioning the windows to avoid cold bridging in an externally insulated building; fitting air tightness tapes with ‘rabbit ears’ to achieve necessary passivhaus 0.6ach @ 50Pa.; positioning windows with inflatable air bags; and fixing windows without plugs and with headless screws in order to ensure the windows are not distorted during fixing.

Thermal imaging at Passfield Drive

New Passivhaus triple glazed windows and doors have now been expertly fitted to the north elevation of 3 Passfield Drive (wall insulation will follow soon). The excellent thermal performance achieved by these windows and the draft-free fitting can be clearly seen in the thermal image of the north elevation below. Comparing the ground floor window of no. 3 to the neighbouring property on the left it is remarkable how much better our house is performing. The same can be said when considering the difference between the new front door of no.